Asbestos FAQs for Property Managers
Managing asbestos in residential and commercial buildings can raise a lot of practical questions, especially after an Asbestos Management Survey has been completed. Property managers, landlords and dutyholders need to understand what the findings mean, what their responsibilities are, and how asbestos information should be managed day to day.
This Asbestos FAQ guide for Property Managers answers common questions about asbestos registers, re-inspections, contractor access, encapsulation, removal and management plans. It is designed to help you understand the next steps after asbestos has been identified, so you can keep records up to date, support safe maintenance works and manage asbestos risks in a clear, compliant and proportionate way.
Does asbestos always need to be removed?
No, asbestos does not always need to be removed.
If Asbestos Containing Materials (ACMs) are in good condition and are unlikely to be disturbed, they can often be managed safely in place. In fact, unnecessary removal can create a greater risk if asbestos fibres are released during the works.
The important point is that ACMs left in place must be properly managed. This means they should be:
Recorded in the asbestos register
Included within an asbestos management plan
Checked regularly for changes in condition
Clearly communicated to contractors or anyone who may disturb them
Reviewed before maintenance, refurbishment or installation works take place.
If the condition of an ACM deteriorates, or the area is likely to be disturbed, the management approach should be reviewed.
What is an Asbestos Re-Inspection Survey?
An Asbestos Re-Inspection Survey is a follow-up inspection used to check the condition of previously identified or presumed ACMs.
The purpose of the re-inspection is to confirm whether the ACMs remain in the same condition or whether there has been any damage, deterioration, disturbance or change in risk.
Following the re-inspection, the asbestos register should be updated so that the dutyholder has current information on the location and condition of ACMs within the building.
For property managers and landlords, this is particularly important because asbestos information may need to be shared with contractors before maintenance, repair or refurbishment works are carried out.
How often should asbestos be re-inspected?
The frequency of asbestos re-inspections should be based on the risk presented by the asbestos-containing materials. Many dutyholders carry out annual re-inspections, although higher-risk materials or areas more vulnerable to damage may require more frequent inspections.
A re-inspection may also be required sooner if:
Building works have taken place
An ACM has been disturbed or damaged
There has been a leak, impact or other incident
Access arrangements or building use has changed
Contractors are due to work near known or presumed ACMs
The previous survey identified areas that could not be accessed
The asbestos register should be treated as a live document, not a one-off report.
Why do contractors need access to the asbestos register?
Contractors should be given asbestos information before they begin work on site.
This is because maintenance, repair, installation and refurbishment works can disturb asbestos if the location and condition of ACMs are not known in advance.
As a property manager, landlord or dutyholder, you should ensure that relevant asbestos information is available to those who may need it, including:
Maintenance contractors
Electricians
Plumbers
Decorators
Fire safety contractors
Refurbishment teams
Emergency contractors
Site staff or caretakers
Contractors should request the relevant asbestos information before commencing work. This helps ensure that the works can be planned safely and that appropriate controls are in place.
What is asbestos encapsulation?
Asbestos encapsulation is a method of managing ACMs by sealing or enclosing the material to reduce the risk of fibre release.
It may be considered where the ACM does not need to be removed but would benefit from additional protection. For example, encapsulation may be suitable where a material is lightly damaged, exposed, vulnerable to future damage, or located in an area where it could be disturbed.
Encapsulation may involve applying a protective coating, sealant, board, wrap or enclosure around the ACM. The aim is to prevent asbestos fibres being released under normal foreseeable conditions, such as vibration, minor impact or age-related deterioration.
The suitability of encapsulation should always be based on the survey findings, the material type, the level of damage, the likelihood of future disturbance and the recommendations of a competent asbestos professional.
Is encapsulation better than asbestos removal?
Encapsulation can be a practical and proportionate way of managing certain ACMs, but it is not suitable in every situation.
Encapsulation may be appropriate where:
The ACM is generally stable
The damage is minor
The material is unlikely to be heavily disturbed
The encapsulated area can still be monitored
The work can be carried out safely by competent persons
Removal may be more appropriate where:
The ACM is badly damaged
The material is friable or likely to release fibres
The area will be affected by refurbishment or demolition
Future disturbance is likely
Encapsulation would only delay an unavoidable removal
If encapsulation is used, the asbestos register and management plan should be updated to show what has been done and when future checks are required.
When is asbestos removal necessary?
Asbestos removal may be necessary where ACMs are damaged, deteriorating, likely to be disturbed, or cannot be safely managed in place.
Removal may also be required before certain refurbishment or demolition works begin. This is because ACMs may be present within the building fabric, service voids, risers, ceiling spaces, ducts, floor coverings or other areas not accessed during a standard management survey.
In these situations, a Refurbishment and Demolition Survey may be required before works start. This type of survey is more intrusive than a management survey and is designed to identify ACMs that could be disturbed during the planned works.
Examples of situations where further asbestos assessment may be needed include:
Refurbishment of communal areas
Replacement of ceilings, flooring or wall panels
Works to risers, ducts or service voids
Roof works
Major mechanical or electrical works
Demolition
Intrusive fire safety or compartmentation works
Installation projects that disturb the building fabric
The key point is that asbestos should be considered before works are instructed, not after contractors arrive on site.
Who can remove asbestos-containing materials?
Any work involving ACMs should only be undertaken by competent persons with appropriate training, equipment and control measures.
Certain asbestos work is licensable and must only be carried out by a contractor licensed by the Health and Safety Executive (HSE). Licensable work may include work involving asbestos insulation, asbestos insulating board, sprayed coatings, pipe lagging and other higher-risk ACMs, depending on the nature and condition of the material and the work being undertaken.
Before most licensable asbestos work begins, the appropriate enforcing authority must normally be notified in accordance with CAR 2012.
Some asbestos work may be classed as non-licensed or notifiable non-licensed work, but it must still be properly risk assessed and carried out using suitable controls.
If you are unsure whether works are licensable, non-licensed or notifiable non-licensed, you should seek advice from a competent asbestos professional before proceeding.
What should property managers do if asbestos is identified?
If asbestos has been identified in a building you manage, the priority is to ensure it is properly recorded, monitored and communicated.
A practical next step would be to check:
Is the asbestos register up to date?
Are all known and presumed ACMs clearly recorded?
Are any ACMs damaged or likely to be disturbed?
Are actions from the survey report outstanding?
Are the condition of ACMs and the asbestos management plan being reviewed regularly?
Are contractors being given asbestos information before works?
Are re-inspections being completed at the correct frequency?
Will any upcoming refurbishment or demolition works require a Refurbishment and Demolition (R&D) asbestos survey?
Good asbestos management is about maintaining control of the risk over time. A survey is only useful if the findings are acted upon, kept up to date and shared with the right people.
Need support with asbestos re-inspections or asbestos management?
At 4site Consulting, we’re here to make asbestos management simpler. Our experienced team can review your existing asbestos information, advise you on the next steps and help ensure your records remain clear, current and practical for day-to-day residential and commercial property management.
Whether you need guidance, a re-inspection or a new asbestos survey, we’re happy to help.
Get in touch with our team today or call 01376 572936.
FAQ Summary
-
No. If asbestos-containing materials are in good condition and unlikely to be disturbed, they can often be managed safely in place.
-
Asbestos re-inspections are commonly carried out annually, although higher-risk materials or changing site conditions may require more frequent checks.
-
A management survey helps manage ACMs during normal occupation and use. A refurbishment and demolition survey is more intrusive and is required before works that may disturb the building fabric.
-
Yes, in some cases. Encapsulation may be suitable where the ACM is stable or only lightly damaged, but it must be assessed by a competent person.
-
The dutyholder is usually the person or organisation responsible for the maintenance or repair of the building, such as the building owner, landlord, managing agent or responsible property manager.
-
Yes. Contractors who may disturb asbestos should be given relevant asbestos information before starting work.